SURVEY TYPE / EXPERTISE

Utility Survey

SUE Quality Level A–D utility mapping above and below ground.

Storm / sanitary sewer, water, gas, electric, fiber/telecom mapping with SUE-quality designations and conflict reports.

PT-101BM-02CP-03
UTILITY-01
STAMPED · SIGNED · CERTIFIED

Sealed under a licensed
Professional Land Surveyor.

Every signed deliverable carries the embossed PLS seal of our retained Florida-licensed surveyor. The layout sheet ships with title block, north arrow, scale bar, basis-of-bearings note and full control-point monumentation legend — production-ready for recording, permitting or fabrication.

NSWE
NORTH
SCALE 1" = 50'050100150200 ft
SCALE
MON
MONUMENT
SHEET 1 / 1
PROFESSIONAL · LAND · SURVEYORSTATE OF FLORIDA · LIC # PLS-7421CTSEALREG · 2026SIGNED · DATE 02·21·26
PLS-7421 · FL
CT-CERTIFIED
WHAT WE COVER

List of items we cover in our drafting.

Below is an indicative list — every Utility Survey ships with the items relevant to your scope, mapped to your layer convention and title block.

Drafted linework
Bearing rotations
Annotative labelling
Legal descriptions
Flood-zone overlay
Easement overlay
Image / raster vectorization
Recordable plats
Section subdivision
Metes & bounds calls
Hand-sketch tracing
Paper-to-DWG conversion
Sanitary & storm lines
Subsurface utility mapping
Schedule B exception plotting
Table A items
Surveyor certifications
Zoning compliance notes
OUR PROCESS

Our Land Survey CAD
drafting workflow.

01
Upload your field data

Drop point files, raw collector exports, sketches or scans into our secure portal — encrypted in transit and at rest.

02
Scoped quote in two hours

A senior surveyor-drafter reviews scope, asks any clarifying questions and returns a fixed-fee quote with a deliverable date.

03
CAD production

Drafted in your template, your layer convention, your title block. We don't ship until your spec is matched.

04
Two-pass QA check

First pass against your standards manual; second pass against the original field notes. Discrepancies flagged before delivery.

05
Delivery + revisions

Final DWG, DXF and stamped PDF in your preferred package format. Two rounds of revisions included in every engagement.

GETTING STARTED

Documents we need
to get started.

Office Standards Pack
  • Sample DWG sheets
  • Sample stamped PDFs
  • Title block templates (ANSI / ARCH sizes)
  • Point code library
  • Drafting notes / abbreviations
  • Preferred CAD platform
Project-Specific Inputs
  • Point file (PNEZD, PNZ, ASCII)
  • Geo-referenced orthos / aerials
  • Site photographs
  • Prior recorded surveys
  • Hand-drawn field sketches
  • Plat maps
  • Vesting deed
  • Title commitment / Schedule B
File Transfer Channels
  • Dropbox / Google Drive
  • OneDrive / SharePoint
  • Client PM systems (Procore, Asite)
  • SFTP servers
  • Encrypted email attachments
  • Custom secure portal
PARTNERSHIPS / COVERAGE

Active in every
US state.

COVERAGE / 50 STATES + DC

Active clients in
every US state.

51
States Active
206+
Total Firms
50+DC
Coverage

Hover any state to see the number of active CAD / BIM / Survey clients we currently support there. Florida, Texas, California and New York are our densest accounts — but every state on the map has at least one active engagement.

60+
Land Surveying Firms
FL · TX · GA · CA
40+
Civil Engineering
North America
30+
Architectural Studios
FL · NY · IL · CA
20+
Steel Fabricators
TX · OH · PA
ACTIVE PROJECT DISCIPLINES

Where our work shows up.

Engagement snapshot by state and discipline. Real client brand marks are only added after written marketing permission is on file.

FLSURVEYING
ENGAGEMENT · #1
TXCIVIL ENG.
ENGAGEMENT · #2
CAARCHITECTURE
ENGAGEMENT · #3
NYSURVEYING
ENGAGEMENT · #4
GASTEEL FAB.
ENGAGEMENT · #5
ILBIM
ENGAGEMENT · #6
OHSTEEL FAB.
ENGAGEMENT · #7
PACIVIL ENG.
ENGAGEMENT · #8
WHY US

Why leading firms
choose us.

Drafters who've worked your side

Every senior lead at CAD Techies spent at least seven years inside US-based AEC firms before joining us.

Written QA, not promised QA

ISO 9001 workflow. Every sheet gets a signed-off checklist against your standards manual before it leaves.

Three time zones, one calendar

Coordinated US, EU and APAC shifts mean a sheet started Tuesday afternoon is QA'd by Wednesday morning.

Your template, not ours

We open your sample DWG before drafting starts. Our title block, layer convention and line-weights mirror yours.

One named senior lead

Not a rotating offshore pool. The drafter assigned in week one is the drafter in week fifty-two.

Transparent US-business terms

Net 30 invoicing, fixed hourly / per-sheet / per-project rates locked in writing. No surprise change orders.

TECHNOLOGY

Software expertise.

Autodesk
Civil 3D
SURVEY · CIVIL
Autodesk
AutoCAD LT
2D DRAFTING
Carlson SW
Carlson Survey
SURVEY · FIELD-TO-FINISH
Bentley
MicroStation
INFRASTRUCTURE CAD
Leica
Cyclone 360
POINT-CLOUD REGISTRATION
Autodesk
Revit
BIM AUTHORING
Pix4D
Pix4D Mapper
PHOTOGRAMMETRY
Blue Marble
Global Mapper
GIS · TERRAIN
NEXT STEP

Get started with us today.

Send your field data, point files and templates — we'll return a fixed quote within 2 hours and a pilot sheet within 48.

DEEP DIVE / 001

Utility Survey — Drafting Workflow & Standards

REQUEST A CALL

Every Utility Survey we deliver is QA'd against your firm's standards manual before handover. Storm / sanitary sewer, water, gas, electric, fiber/telecom mapping with SUE-quality designations and conflict reports.

Our senior team has spent the last decade inside US-based surveying and engineering firms. That means we understand the field workflow, the recorder requirements, the FEMA / ALTA / state-specific quirks and the title-block conventions your stakeholders expect.

DWGDXFPDFCivil 3DCarlson SurveyISO 9001
READY TO DRAFT?

Let's work together on your utility survey project.

Send us your point files, sketches and templates — we'll return production-ready CAD drawings within 24-48 hours.

DIRECT CONTACT
EMAIL
cadtechies@gmail.com
WHATSAPP · TALK TO US
+1 (506) 777-7400
RESPONSE
Within 1 business day